Tunnelling in Iran is a very challenging and interesting job because of special geological conditions and dimensions of new defined projects. In the past using of conventional method statement (like Drill and Blast) was very usual in Iran but because of many new tunnel projects within last 15 years that they should be finished in time frame of clients utilizing of mechanized systems like Tunnel Boring Machines is being rapidly developed.

In this working environment some specialists have grown and one of the best made a group of the most experienced engineers named Tunnel Design Team.

The engineers working under this umbrella have been involved in different design and construction of tunnel and underground spaces projects individually and also all of them have been working together.

As you will find in the website we have designed different self drilling bolts for tunnels like metro, water, sewerage, cable, etc. with professional and cost-effective solutions, from planning and design to project management and consulting, as well as providing inspections and claim reports.